Skip to content
Field Service · 86 Engineers Online

ELECTROMECHANICAL EPC · TÜRKİYE · EST. 2007

Engineering the energy transition across 0.4 kV → 154 kV, battery storage, and SCADA — under one ISO-certified floor.

Er Teknik Enerji designs, manufactures, and commissions turnkey power systems for refineries, white-goods plants, military bases, and utility-scale renewables across 11 countries — audited by TÜV Rheinland, KfW, and Deloitte.

Founded 2007 Gebze, Kocaeli
Headcount 312 incl. 41 PE-licensed
Turnover FY23 $87.4M audited Deloitte
Footprint 11 countries delivered
Field service 86 engineers online
Inside Er Teknik Enerji's Kocaeli switchgear assembly hall.
DOC.ETE/HERO-01 In-house panel shop · 6,400 m² · Gebze OSB
0.4 kV LV/ 36 kV MV/ 154 kV HV/ BESS/ ETE-Scada/ Field service · 86 online

§ 01 · CAPABILITY LADDER

One ISO 9001:2015 + IEC 61439 floor. Five voltage tiers. End-to-end SCADA.

Every panel that leaves our Kocaeli shop is built under the same quality plan — from 0.4 kV motor-control centers to 154 kV HV substations, including the BESS power-conversion and the ETE-Scada automation layer above them.

  1. 01

    0.4 kV LV Switchgear & Motor-Control

    Form-4 segregation, IEC 61439-1/-2 type-tested assemblies, 6,400 A busbars, fully type-tested withdrawable modules. Manufactured in-house on our Kocaeli LV line.

    • IEC 61439-1/-2
    • Form 4b
    • Up to 6,400 A
    • 65 kA / 1 s
  2. 02

    36 kV MV Cells & Primary Distribution

    Air- and gas-insulated switchgear up to 36 kV, 31.5 kA short-time withstand, arc-fault tested to IEC 62271-200. The only Turkish EPC with LV and MV cells under one ISO-certified floor.

    • IEC 62271-200
    • 31.5 kA / 3 s
    • AFL up to 31.5 kA
    • Arc-tested
  3. 03

    110–154 kV HV Substations (EPC)

    Turnkey AIS & GIS substations including civil works, protection & control, SCADA integration, and commissioning. Bundled with bankable performance guarantees accepted by Euler Hermes, Coface, and Türk Eximbank on projects up to $35M.

    • 154 kV / 40 kA
    • AIS & GIS
    • IEC 61850-3 Ed.2
    • Bankable guarantee
  4. 04

    Battery Energy Storage & Power Conversion

    Containerised LFP BESS, DC-DC and bidirectional AC-DC converters, MV transformers, EMS integration. Reference: the 96 MW Soma BESS, awarded Industrial Energy Project of the Year by the Turkish Energy Industry Confederation (EİB) in 2022. KfW third-party verified LCOE $0.031/kWh on PV-plus-BESS hybrids commissioned 2021–2024.

    • LFP chemistry
    • 96 MW reference
    • $0.031/kWh LCOE
    • EMS + SCADA
  5. 05

    ETE-Scada — Substation & Plant Automation

    Proprietary SCADA platform deployed across 412 industrial sites since 2018. IEC 61850-3 Edition 2 certified — held by only 6 vendors in EMEA. Reduces unplanned downtime by an average of 47% within 12 months of go-live.

    • 412 sites live
    • IEC 61850-3 Ed.2
    • −47% downtime
    • Cybersec: IEC 62443

§ 02 · AUDITED CREDENTIALS

The documents procurement officers open before issuing an RFP.

Each card below reads like a data-sheet row: a metric, the third-party auditor who verified it, and the scope it covers. No marketing claims — only items our auditors can re-confirm on request.

P-01

IEC 61850-3 Ed.2 — Substation Automation

1 of 6

Vendors in EMEA holding IEC 61850-3 Edition 2 certification for substation communication platforms. Er Teknik Enerji is the first Turkish firm on that list.

AUDITED BY IEC certification body · re-test cycle 2024

P-02

On-Time Commissioning

98.4%

1,820+ MV/LV substations delivered since 2007, with a 98.4% on-time commissioning rate across the rolling three-year window.

AUDITED BY TÜV Rheinland · report ID TR-2023-EP-1142

P-03

Hybrid PV + BESS — Levelized Cost

$0.031/kWh

Average LCOE on PV-plus-BESS hybrid projects commissioned between 2021–2024, verified against SCADA operating logs and OEM performance files.

VERIFIED BY KfW third-party engineers · 2024 closing memo

P-04

Bankable Performance Guarantees

$35M

Per-project bonded capacity accepted by Euler Hermes, Coface, and Türk Eximbank on cover up to $35M — single-bond ceiling of $42M enables direct bidding on World Bank, EBRD, and IsDB-financed tenders.

CONFIRMED BY Euler Hermes · Coface · Türk Eximbank 2024

ISO 9001:2015 ISO 14001:2015 ISO 45001:2018 ISO/IEC 27001:2022 IEC 61439-1/-2 IEC 62271-200 IEC 61850-3 Ed.2 TÜV Rheinland surveillance

§ 03 · SPEC COVER SHEET

The headline audited figures, on one page.

Substations delivered (2007–2024)
1,820+
MV & LV combined · TÜV-audited
On-time commissioning
98.4%
3-year rolling · TÜV Rheinland
Geographic footprint
11countries
TR · DE · AE · SA · EG · KZ · UZ · AZ · RO · LY · IQ
Bonded capacity · single project
$42MUSD
Euler Hermes · Coface · Eximbank
TRIR · 2022–2024 rolling
0.18
71% below industry median 0.62
Field-service engineers
86online
8-hour SLA · western Turkey
R&D patents · power conversion
14active
Ministry-accredited since 2018
ETE-Scada live sites
412sites
−47% unplanned downtime / 12 mo

§ 04 · VERIFIED ROSTER

Industrial, EPC, and defense procurement already on the books.

Each row names the client and the project class so a procurement officer can recognise their own peers — not a logo strip, a verification list.

Client Sector Project class Engagement window Reference status
Tüpraş Refinery Refinery modernization · 34.5 kV substation + LV MCC fleet 2022–2023 Audited reference
Arçelik White goods Greenfield plant power distribution · 36 kV + LV switchgear 2021–2024 Audited reference
Sabancı Holding Conglomerate / energy Portfolio-wide BESS + SCADA rollout across 4 sites 2022–2024 Audited reference
ENKA EPC contractor Subcontracted HV substation on Libya & Iraq power projects 2021–2024 Audited reference
NATO-commissioned bases (3) Defense Military-base power upgrades · 11 kV distribution + backup 2022 NDA · summary on request
Additional references · 11 countries · available under NDA View full project ledger →

§ 05 · POST-COMMISSIONING PLEDGE

The contractor who stays on site after the handover.

Most EPC bids lose their certainty the moment the commissioning engineer boards the flight home. We don't. Our field-service network is built into the contract — not bolted on as an aftermarket add-on.

Across our 11-country footprint, 86 certified engineers are dispatched from regional hubs in Gebze, Abu Dhabi, and Almaty. A dedicated spare-parts warehouse in Kocaeli holds critical LV cells, MV vacuum contactors, protection relays, and converter spares with a 24-hour cross-dock SLA to any project site in western Turkey within an 8-hour drive.

The handover package includes a printed and digital O&M manual, an ETE-Scada licence with five years of included firmware updates, two scheduled maintenance visits per warranty year, and a 24/7 hotline routed to a senior engineer — not a call centre.